Property Clearing
December 20th, 2010 | View Post
This is definitely something that I’ve wanted to do for a long time now. It wasn’t cheap, but Fig & Co. Builders hired a company to come out to the property, install a silt-fence (as the city requires), and finally level the ground as it was intended to be. There were several dumptruck loads of trash that needed to be removed. Also included was brush, some construction debris, a few knocked down trees, and a bunch of rock.




We also went ahead and had them install a construction entrance at the northwest corner of the property (right where the existing gate is). A construction entrance is what future contractor trucks and heavy machinery will use to enter and exit the property. I’m told it’s not really about traction or anything like that, but rather serves as somewhat of a front-door ‘wipe your feet off’ mat. Basically it helps to remove all of the mud and dirt from the tires of vehicles exiting the property before it gets tracked all over the public street.


Water and Sewer Hookups
December 6th, 2010 | View Post
One of the many issues I’ve long since known we’d have to deal with is with respect to water and sewage taps. Unfortunately the City of Austin does not permit commercial sites to utilize septic systems, so that is already ruled out. We had Rick Selin from the City of Austin run the specs on the property just to get an idea of where the hookups are and how difficult they would be to access.

He was pretty nice and promptly wrote us back with the following:

There is an 8” DI water main infront of the property, however there does not appear to be an existing water service to the property. There is no wastewater main infront of the property. The nearest service points appear to be roughly 185’ north of the north property line near the intersection of Axel & Jackie Robinson or roughly 252’ south of the south property line near the intersection of Axel and Wilcab. To get water service, an engineered tap plan will need to be submitted for review and approval by AWU. To get wastewater service, an engineered plan to extend the wastewater main to the property will need to be submitted for review and approval by AWU. You can speak with Seyed Miri @ 972-0202 to explore the option of an SER for the wastewater portion.


He also provided us with this image of the water lines for the area:


The water lines from the city's GIS data